The number nobody calculates

A forklift is bought against a duty cycle and paid for over a life measured in hours. The invoice is one input; the others are energy, maintenance, tyres, downtime, operator time and the residual value at disposal. A fleet bought on the lowest invoice and run on the wrong duty cycle is the most expensive fleet in the building, and the cost appears in the maintenance account two years later where nobody connects it to the purchase.

The useful single metric is cost per pallet moved or per operating hour at full duty: purchase minus residual, divided by expected hours over the life, plus energy, plus maintenance, plus the cost of unplanned downtime. Comparing two trucks on that metric makes the decision arithmetic instead of opinion.

The trap is comparing on nominal capacity. A 2.5 t truck rated at a 500 mm load centre with a 1.2 m attachment is not a 2.5 t truck any more. The derating is in the data sheet and almost never in the comparison spreadsheet.

Building a cost per hour that survives scrutiny

Start with hours. A single-shift operation at 250 days and 7 productive hours is 1,750 hours a year. Two shifts is 3,500; three is 5,000. The expected life in hours, not in years, is the denominator: a truck rated for 8,000 hours at 2,500 hours a year is a three-year asset, not a ten-year one, regardless of how it looks.

Then energy. Electric power consumption is roughly measurable from the charger: kilowatt hours per shift, times the tariff, times shifts. Diesel and LPG are measurable from the fuel log. The comparison is only fair when both are measured over the same duty, because idling and attachment use change the number substantially.

Then maintenance, from your own history rather than from a brochure. If the current fleet's maintenance cost per hour has been rising for three years, the replacement case is being made by the data. If it has been flat, the fleet is being replaced for reasons that are not economic and the plan should say so.

Battery strategy is a fleet decision

Lead-acid with a battery room is cheap per truck and expensive per site: a room, ventilation, watering, a change cart, and a spare battery per truck to cover the change. Opportunity charging extends the day but shortens battery life. It is a legitimate strategy if the tariff and the shifts support it, and a false economy if they do not.

Lithium-ion removes the battery room and the change, tolerates opportunity charging, and costs more per truck. The payback is usually in the avoided battery room, the avoided spare batteries and the labour of changing - which is real money in a three-shift operation and close to zero in a single-shift one.

The decision is therefore about shifts, not about technology. One shift with a long overnight charge: lead-acid is fine. Two or three shifts with short turnarounds: the case for lithium is usually arithmetic, and the arithmetic is the battery room you do not build.

Duty cycle, attachments and the derating nobody reads

A forklift's rated capacity is defined at a load centre, typically 500 mm from the fork face, and at a defined lift height. Move the load forward with an attachment, and the capacity falls. A 2.5 t truck with a 1.2 m slip-sheet handler may be a 1.4 t truck, and the operators will discover this by feeling the rear axle lift.

The duty cycle also includes the number of lifts per hour, the average lift height, the travel distance and the floor condition. A truck doing 40 lifts an hour to 6 m on a rough floor is a different asset from one doing 12 lifts an hour to 2 m on a smooth slab, even at the same tonnage.

Specify the duty cycle as numbers and ask the supplier to confirm the derated capacity at your attachment and your lift height in writing. A supplier who will not put that in writing is selling a brochure.

Using your own maintenance history as evidence

The maintenance record is the only honest predictor. Pull three years of work orders and sort them into: scheduled service, wear items, unscheduled repairs, and accidents. If unscheduled repairs are more than a third of the total, the fleet is telling you something - usually that the duty cycle is wrong or that the trucks are being asked to do work they were not specified for.

Downtime is the invisible cost. A truck off the floor for a day in a two-truck operation is half the capacity; the rent or the overtime to cover it never appears in the maintenance account. Put a number on it - even a rough hourly cost of a stopped task - and the replacement case becomes visible.

Residual value and the disposal decision

Residual value is a function of hours, condition, brand support and battery state. A truck sold at 6,000 hours with a documented service history is worth substantially more than the same truck at 9,000 hours with none. The maintenance record is therefore an asset in the literal sense.

Disposal timing matters more than disposal method. Selling at the point where maintenance cost per hour crosses the cost of capital on a new truck is the economically correct moment; selling when the truck fails is usually a year late and at a discount.

For the trucks themselves, the specification range behind these notes is set out in our forklift range, including the capacity, lift height and attachment details that decide the derated rating.

The five-line spreadsheet

Purchase price, residual, expected hours, energy per hour, maintenance per hour. Those five lines, applied to two options over the same duty, produce a decision that can be defended to a finance director. Everything else - colour, brand, dealer relationship - is a reasonable secondary consideration once the arithmetic is done.

Add one line for downtime cover and one for the battery strategy, and the sheet is complete. If the answer changes when a single input moves by 10%, the input is the decision: measure it before signing.

Replace on the arithmetic, not on the failure. A fleet replaced one truck at a time after breakdowns is a fleet that pays a premium for urgency every time.

Operator behaviour and the tyre bill

Tyres are the fleet's honest wear indicator. A fleet that eats solid tyres in eighteen months on a smooth floor is being driven hard, and the cost per hour model that assumed a three-year tyre life is wrong by half. The tyre bill is therefore a diagnostic as well as a cost line.

The behaviours that cost money are measurable: braking into a turn, carrying loads high, travelling fast over expansion joints, and turning on the spot. Telematics records all four. A fleet with telematics and no coaching programme has bought data and not behaviour.

The cheapest intervention is usually layout, not training. A traffic plan with one-way aisles, marked turn areas and pedestrian zones reduces impact damage more reliably than a briefing, because it removes the opportunity rather than asking for restraint.

Buy, lease or rent: the cash question

Buying puts the residual risk on the buyer and the capital on the balance sheet. Leasing converts capital into a fixed monthly cost and moves the residual risk to the lessor, at a price. Renting covers peaks and seasonal work, at a higher rate per hour.

The decision follows the hours: a truck that runs 4,000 hours a year for a stable operation is usually cheaper bought; a truck that runs 800 hours for a seasonal peak is usually cheaper rented; and a fleet that is about to be re-laid-out is usually cheaper leased short.

The trap is the lease that bundles maintenance without a service-level definition. A bundled maintenance contract that promises ' scheduled service' and excludes 'damage' has moved the wear risk back to the operator without saying so.

What to check

  • Convert every quote to cost per hour at your duty cycle, not cost per truck.
  • Confirm derated capacity at your attachment and lift height in writing.
  • Choose the battery strategy by shift pattern, not by technology fashion.
  • Sort three years of work orders into scheduled, wear, unscheduled and accident.
  • Put a number on downtime; it is usually the largest hidden cost.